Equipment lifting should take off and land smoothly without being impacted; The installation should be stable and firm, and the tower body should be vertical. In windy areas, the tower body should be reinforced; The pipeline connected to the equipment should avoid all its weight acting on the connecting pipe of the equipment, and the outlet pipe at the top of the tower should be fixed; Suggest installing compensators for takeover and pipeline connections; When driving, the absorption liquid water pump should be started first, the fan should be turned on, and it should run normally before entering the system; During system operation, the flow rate of the water pump should be adjusted to prevent excessive or insufficient flow from affecting the effectiveness of use; Pay attention to the water level at the bottom of the tower to prevent liquid from entering the air duct; Prevent debris from entering the tower and blocking channels and pipelines; If the medium has viscosity or sediment adhering to the tower, causing a decrease in treatment effect, the flange can be disassembled to clean the blades
Jiangsu Grand Environmental Engineering Technology Co., Ltd
Adress:No. 5, Qindong new material equipment Industrial Park, Dongtai, Jiangsu Province
Telephone: 0515-85291988
E-mail:grandco1988@163.com
Jiangsu Geande Environmental Protection Engineerin 苏ICP备20029340号